Sub-Slab Depressurization Systems and Sub-slab depressurization System Installation

 Sub-slab depressurization systems first began in the early 1990s to fix radon gas problems in homes. The sub-slab system uses a fan or blower attached to pipes placed in shallow pits below a building floor slab and drains the vapors into the atmosphere. The process stops vapors from entering occupied areas. 

 The amount of negative pressure required depends on two main site conditions: 

1) airflow in the material instantly beneath the slab; and 

2) airflow and pressure variations created by the building heating and air-conditioning systems. 


An SSD system needs a relatively low vacuum, so blower sizes tend to be much cost-effective per building area included. On checking the complete site, the engineer conducts a design test to verify that the SSD will extract air from beneath the slab. The design test is a small-scale mock-up of a full-scale system through which small diameter extraction and monitoring points are connected.  

Sub-slab depressurization system installation is reasonably priced. Sometimes the installation is higher. Some factors that can cause installed costs to be on the higher are:

  • Highly changeable subsurface conditions;
  • High soil moisture or high groundwater table;
  • Vapors that require treatment before discharge to the atmosphere (but this is uncommon);
  • Unique construction for piping systems;
  • Larger blowers, condensate removal, specialized mechanical systems, upgraded or explosion-proof electrical systems, and more advanced controls; and
  • Retro-fit necessities of existing buildings.

In the sub-slab depressurization system, installation holes are created in the slab. A suction pit is created by removing a little soil from underneath the section. Post this process; vertical suction funnels are placed into the openings. The pipes are linked with a web containing vapor & exhaust fans, which are eventually released outwards. 

A smaller building requires lesser suction pits than large buildings. 

The process in the installation includes:

  1. Pilot Testing
  2. Drilling
  3. Vapor Collection
  4. Installing Pipes
  5. Sealing 
  6. Venting
  7. Exterior Termination
  8. Monitoring
The Sub-slab depressurization system process is a cost-effective and simple approach to lessen vapor intrusion. Still, the collection of critical data and basic design parameters are essential steps to assure successful operation. 

Comments

Popular posts from this blog

First Environmental Assessment Company of Phase I Sites

Who All Can Benefit From Environment Due Diligence?

Remediating the Environment: Need and the Business